- Help Center
- Route
- Project Configuration
Route Reporting Only Project: New Workflow
You can create route deliverables for your user created route by uploading the route and running the reports.
Reporting in Route
To run a reporting project in Route, follow the normal Route workflow and upload your route rather than create a system generated route.
Reporting Project Workflow
1. Create a new project and select the datasets you would like to include in your Route reporting
2. Create an AOI by drawing or uploading an objective path
a. Draw a line between two objectives
b. Upload the line you intend to report on if it includes less than 15 vertices
3. Upload your line in the routes panel
5. Run your reports in the downloads panel